Timeline
Timeline
1995 
Business Enterprises Services (BES)
A world-class integrated consultancy set up in Abu Dhabi
1997 
Abu Dhabi National Industrial Projects Co. (ADNIP)
A pioneering greenfield industrial investment group established
1999 
Abu Dhabi Medical Devices (ADMD)
Highly advanced facilities to manufacture medical syringes and IV infusion sets commissioned
2000 
Abu Dhabi National Paper Mill (ADNPM)
The largest, most advanced producer of jumbo tissue paper rolls in Abu Dhabi set up
2001 
Abu Dhabi National Carpet Factory (ADNC)
The first carpet manufacturing company in Abu Dhabi established
2002 
ADNPM Phase II Expansion
First Crescent Former paper tissue machine (PM 1) installed
2003 
ADMD Phase II Expansion
Auto Disable (AD) syringes introduced
2005 
ADMD Phase III Expansion
Second AD syringe assembly line added
2006 
ADMD Phase III Expansion (Continued)
BCG syringes introduced
2006 
ADNC Phase II Expansion
UAE’s first Axminster weaving machine commissioned • Two new tufting machines installed
• New BCF machine commissioned • New Yamaguchi machine installed
2007 
ADNPM Phase III Expansion
Second Crescent Former paper tissue machine (PM 2) added • Waste treatment De-Inking Plant (DIP) commissioned
2007 
ADNC Phase III Expansion
Second Axminster and Yamaguchi machines installed • Three new tufting machines added
2007 
ADMD Phase IV Expansion
AD syringe assembly line incorporated
2010 
ADNC Phase IV Expansion
Third Yamaguchi machine added
2011 
ADNC Phase V Expansion
Heatset added • Cabling capacity for Frieze installed
2011 
ERP and Hyperion installed across all group subsidiaries
Oracle E-business Suite and Hyperion implemented to integrate best business practices